• Skip to content
  • Accessibility
  • About the group
  • Careers
Close Search form
Inverness Airport Visit the Highlands and Islands Airports Limited home page Inverness Airport Part of the Highlands and Islands Airports Limited Group
Menu
  • Home
  • Airport Info
    • Airport Information
    • Assistance and Accessibility
    • Inverness Airspace Change
    • Inverness Airport Master Plan
    • Security Search FAQs
    • Safeguarding at our airport
    • Inverness Airport Consultative Committee
    • Aeronautical Ground Lighting Upgrade at Inverness Airport
    • UK eVisas
  • Destinations
    • Destinations
    • Amsterdam
    • Belfast
    • Bristol
    • Highlands and Islands
    • London
    • Majorca
    • Manchester
    • The World
  • General Aviation
  • News
  • Contact Us
  • Accessibility
  • About the group
  • Careers
  1. Home
  2. Inverness Airport
  3. Inverness Airspace Change Documents

Inverness Airspace Change Documents

  • June 24 Addendum to the INV ACP submission

    • PDF
    • 2.21MB
    • Download
  • Inverness Airport Airspace Change - Update December 2022

    • PDF
    • 749kB
    • Download
  • Inverness Airport Airspace Change Proposal - Addendum - March 2022

    • PDF
    • 109kB
    • Download
  • Inverness Airport Airspace Change Proposal Summary - January 2022

    • PDF
    • 119kB
    • Download
  • Inverness Airspace Change First Consultation Report - 10 August 2015

    • PDF
    • 987kB
    • Download
  • Inverness Airspace Change Second ('Addendum') Consultation Document - 29 July 2016

    • PDF
    • 4.31MB
    • Download
  • Proposed Changes to Inverness Airport Airspace - FAQs

    • PDF
    • 604kB
    • Download
  • Proposal for the Introduction of CAS Optimisation of IFPs - 02 June 2017

    • PDF
    • 1.55MB
    • Download
  • CAP1378 Airspace Design Guidance - Noise mitigation considerations when designing PBN departure and arrival procedures - March 2016

    • PDF
    • 3.34MB
    • Download
  • CAP1379 Description of ATC Route Structure and Operational Techniques - March 2016

    • PDF
    • 912kB
    • Download
  • Draft RWY23 Transitions

    • PDF
    • 627kB
    • Download
  • Draft RWY23 SIDs

    • PDF
    • 657kB
    • Download
  • Draft RWY05 SIDs

    • PDF
    • 668kB
    • Download
  • Draft RWY05 Final Approach

    • PDF
    • 206kB
    • Download
  • Draft RWY05 Transitions

    • PDF
    • 658kB
    • Download
  • Draft RWY23 Final Approach

    • PDF
    • 203kB
    • Download
  • Inverness Airspace Change FUA CTA 8 Awareness

    • PDF
    • 239kB
    • Download
  • Inverness ACP Update - March 2025

    • PDF
    • 238kB
    • Download
  • Contact us
  • Media Centre
  • Privacy Notices
  • Modern Slavery
  • Accessibility Settings
Find us on:
  • Follow us on: Facebook (opens a new window)
  • Follow us on: Twitter (opens a new window)
  • Follow us on: LinkedIn (opens a new window)
  • Follow us on: Instagram

© 2025 Highlands and Islands Airports Limited. All Rights Reserved.

Head Office, Inverness Airport, Inverness, Scotland, IV2 7JB

Highlands and Islands Airports Limited

© 2025 Highlands and Islands Airports Limited. All Rights Reserved.

Designed and powered by Jadu